Technical requirements for machining mechanical parts


Release time:

2020-09-24

【Summary】Profile Processing of Parts 1. The unmarked shape tolerance should comply with GB1184-80 requirements. 2. The unmarked length dimension allows a deviation of ±0.5mm. 3. The unmarked corner radius is R5. 4. The unmarked chamfer is C2. 5. Acute angles should be rounded off. 6. Sharp edges should be rounded off, and burrs should be removed. Surface Treatment of Parts 1. The machined surface of the part should not have scratches, abrasions, or other defects that damage the surface. 2. The machined threaded surface should not have defects such as black skin, bumps, miscuts, and burrs. All steel parts that require painting must have rust, scale, grease, dust, dirt, salt, and other contaminants removed before painting. 3. Before rust removal, use organic solvents, alkaline solutions, emulsifiers, steam, etc., to remove grease and dirt from the surface of the steel parts. 4. The time interval between the surface that has been shot-peened or manually derusted and the application of primer should not exceed 6 hours. 5. The surfaces of riveted parts that come into contact must be coated with a rust-proof paint of thickness 30-40μm before connection. Overlapping edges should be sealed with paint, putty, or adhesive. Damaged primer due to processing or welding must be repainted. Heat Treatment of Parts 1. After tempering, HRC 50-55. 2. Medium carbon steel: 45 or 40Cr parts undergo high-frequency quenching, tempering at 350-370℃, HRC 40-45. 3. Carburizing depth of 0.3mm. 4. High-temperature aging treatment should be performed. Technical Requirements After Finishing 1. Finished parts should not be placed directly on the ground; necessary support and protection measures should be taken. 2. The machined surface should not have rust, corrosion, or defects that affect performance, lifespan, or appearance, such as bumps and scratches. 3. The surface of the rolled finish should not have peeling after rolling. 4. The surface of parts after the final heat treatment should not have scale. The machined mating surfaces and tooth surfaces should not have annealing. Sealing Treatment of Parts 1. All sealing components must be soaked in oil before assembly. 2. Strictly check and remove sharp edges, burrs, and foreign objects left during part processing before assembly. Ensure that the sealing components are not scratched during installation. 3. Excess adhesive that flows out should be removed after bonding.

                                                                                        Mechanical Parts Processing Technical Requirements

Profile Processing of Parts

1. The unmarked shape tolerance should comply with GB1184-80 requirements.

2. The unmarked length dimension allows a deviation of ±0.5mm.

3. The unmarked corner radius is R5.

4. The unmarked chamfer is C2.

5. Acute angles should be rounded.

6. Sharp edges should be rounded, and burrs should be removed.

Surface Treatment of Parts

1. The processed surface of the parts should not have scratches, abrasions, or other defects that damage the surface.

2. The processed threaded surface should not have defects such as black skin, bumps, miscuts, and burrs. All steel parts that need to be painted must have rust, scale, grease, dust, dirt, salt, and other contaminants removed before painting.

3. Before rust removal, the grease and dirt on the surface of the steel parts should be removed using organic solvents, alkaline solutions, emulsifiers, steam, etc.

4. The time interval between shot blasting or manual rust removal and applying the primer should not exceed 6 hours.

5. The surfaces of riveted components that come into contact must be coated with a rust-resistant paint with a thickness of 30 to 40 μm before assembly. The overlapping edges should be sealed with paint, putty, or adhesive. If the primer is damaged due to machining or welding, it should be repainted.

Profile Processing of Parts

1. The unmarked shape tolerance should comply with GB1184-80 requirements.

2. The unmarked length dimension allows a deviation of ±0.5mm.

3. The unmarked corner radius is R5.

4. The unmarked chamfer is C2.

5. Acute angles should be rounded.

6. Sharp edges should be rounded, and burrs should be removed.

Surface Treatment of Parts

1. The processed surface of the parts should not have scratches, abrasions, or other defects that damage the surface.

2. The processed threaded surface should not have defects such as black skin, bumps, miscuts, and burrs. All steel parts that need to be painted must have rust, scale, grease, dust, dirt, salt, and other contaminants removed before painting.

3. Before rust removal, the grease and dirt on the surface of the steel parts should be removed using organic solvents, alkaline solutions, emulsifiers, steam, etc.

4. The time interval between shot blasting or manual rust removal and applying the primer should not exceed 6 hours.

5. The surfaces of riveted components that come into contact must be coated with a rust-resistant paint with a thickness of 30 to 40 μm before assembly. The overlapping edges should be sealed with paint, putty, or adhesive. If the primer is damaged due to machining or welding, it should be repainted.

Heat Treatment of Parts

1. After tempering treatment, HRC50-55.

2. Medium carbon steel: 45 or 40Cr parts undergo high-frequency quenching, tempering at 350-370℃, HRC40-45.

3. Carburizing depth is 0.3mm.

4. High-temperature aging treatment should be performed.

Technical Requirements After Finishing

1. Finished parts should not be placed directly on the ground; necessary support and protection measures should be taken.

2. The processed surface should not have rust, corrosion, or defects that affect performance, lifespan, or appearance, such as bumps and scratches.

3. The surface of the rolled finish should not have peeling after rolling.

4. The surface of parts after the final heat treatment should not have scale. The machined mating surfaces and tooth surfaces should not have annealing.

Sealing Treatment of Parts

1. All sealing components must be soaked in oil before assembly.

2. Strictly check and remove sharp angles, burrs, and foreign objects left over from processing before assembly. Ensure that the sealing components are not scratched during installation.

3. Excess adhesive that flows out should be removed after bonding.