【Summary】1. The inspection and acceptance site can be at the contractor's factory or the delivery location designated by the client, and the results should be consistent, with the final result being based on the destination results. 2. Refer to the standard enterprise standard Q/DMBM307-1997: Inspection sampling rules. 3. Cabinet 3.1 Dimensional tolerances 3.2 Geometric tolerances The sheet metal cabinet must not have any visible tilt or local distortion or twisting. The verticality of the frame columns to the base should be less than 1.5mm. During inspection, the top surface of the base is used as the reference, and the inner edge of the upper end of the column is the measurement point. The parallelism of the top frame to the base should be less than 1mm. The measurement points are the top surface of the base and the bottom surface of the top frame, which serve as mutual references. It can also be checked by measuring the lengths of the diagonals of the six faces, with a difference not exceeding 2.5mm. If there is a partition, the parallelism of the top frame to the base can be relaxed to 1.5mm, and the parallelism of the partition to the top frame or base should be less than 1mm. The absolute value of the difference in the diagonals of the upper and lower frames should be less than 1.5mm. The columns must not have any twisting, and the parallelism of the joint lines of each column connected to the upper and lower frames to the adjacent plane of the frame should be less than 0.5mm. 3.3 The sliding rails for supporting the insert box should have a parallelism of 1mm relative to the top surface of the base for the left and right sliding rails on the same level, and the absolute value of the difference in the gap between the two adjacent panels after the insert box is installed should not exceed 0.6mm. 3.4 The front, back, and left and right side doors must not have bulging, distortion, or other phenomena, and their flatness should be less than 2mm. Within a local area of 100mm x 100mm, it should not exceed 0.4mm. After all door panels are installed in the cabinet, the parallelism of their outer surface to the side of the cabinet should not exceed 1.5mm, and the absolute value of the difference in the parallel gaps at various places should be less than 2mm, ensuring a good fit with the frame. The absolute value of the difference in the same gap of fixed door panels should be ≤1mm; rotating door panels must not have obvious sagging or lifting, and the absolute value of the difference in the same gap should be ≤1.8mm. Doors that require opening and closing must rotate smoothly, with an opening angle ≥90°, and after closing, they should adhere well to the door magnet, with no interference that could damage the coating during rotation. Side doors should be flexible to install and remove. For rotating door panels, when installed and opened to about 30°, measure the vertical distance from the side farthest from the pivot to the front plane of the frame; the difference between the maximum and minimum values should be ≤10mm. 4. Chassis and insert frame 4.1 The flatness of the bottom surface and other side surfaces of the chassis should be 1mm. 4.2 The verticality of the front and rear or left and right vertical surfaces of the chassis relative to the bottom surface should be 1mm. 4.3 The parallelism of the top and bottom surfaces of the panel should be 0.5mm, and the verticality of the side and bottom surfaces should be 0.5mm. 4.4 After the panel is installed in the chassis, it should be vertical and upright, with the verticality of its side to the bottom surface of the chassis being 0.5mm, and the parallelism of the bottom surface to the bottom surface of the chassis being 0.5mm. 4.5 When installing the circuit board or the insert frame of the chassis, it is necessary to use tooling to simulate the circuit board or chassis for assembly. The tooling should be smooth when inserting and removing the insert box, and after the insert box is installed, it should be stable and secure, with no floating or looseness. The hard-connected connectors should align accurately, and there should be no abnormal resistance when inserting or removing.

                                                                                            Basic and Conventional Technical Requirements for Chassis Cabinet Processing

This standard applies to the inspection and acceptance of sheet metal chassis cabinet structural components. It summarizes and supplements the basic and conventional technical requirements that are not exhaustively listed in the design documents or do not need to be specifically pointed out.

  This standard should be executed in conjunction with the technical requirements specified in the design documents. For any clauses that exceed the precision specified in the standard, the designer shall propose, and the quality inspection department shall implement it, or it can be executed according to this standard with the designer's consent.

Chassis Cabinet Processing

  1. The inspection and acceptance site can be at the manufacturing plant or the delivery location designated by the client, and the results should be consistent, with the final result being based on the final delivery location.

  2. Referenced standard enterprise standard Q/DMBM307-1997: Inspection sampling rules.

  3. Cabinet

  3.1 Dimensional Tolerance

  3.2 Geometric Tolerance

  Sheet metal cabinets are not allowed to have visible tilting or local distortion or twisting.

  The verticality of the frame columns to the base should be less than 1.5mm. During inspection, the upper surface of the base is used as the reference, and the inner edge of the upper end of the column is the measurement point.

  The parallelism of the top frame to the base should be less than 1mm. The measurement points are the upper surface of the base and the lower surface of the top frame, which serve as mutual references. It can also be checked by measuring the lengths of the diagonals of the six faces, with a difference not exceeding 2.5mm. If there is a middle partition, the parallelism of the top frame to the base can be relaxed to 1.5mm, and the parallelism of the middle partition to the top frame or base should be less than 1mm.

  The absolute value of the difference in the diagonals of the upper and lower frames should be less than 1.5mm.

Chassis Cabinet Processing

  The columns must not have twisting phenomena, and the parallelism of the joint lines of each column connected to the upper and lower frames to the adjacent plane of the frame should be less than 0.5mm.

  3.3 The sliding rails for supporting the insert box should have a parallelism of 1mm relative to the upper surface of the base, and the absolute value of the difference in the gap between the two adjacent panels after the insert box is installed should not exceed 0.6mm.

  3.4 The front, rear, and left and right side doors must not have bulging, twisting, or other phenomena, and their flatness should be less than 2mm. Within a local area of 100mm x 100mm, it should not exceed 0.4mm. After all door panels are installed in the cabinet, the parallelism of their outer surfaces to the side of the cabinet should not exceed 1.5mm, and the absolute value of the difference in the parallel gaps at various places should be less than 2mm, ensuring good fit with the frame. The absolute value of the difference in the same gap of fixed door panels should be ≤1mm; rotating door panels must not have obvious sagging or lifting phenomena, and the absolute value of the difference in the same gap should be ≤1.8mm. Doors that require opening and closing must rotate flexibly, with an opening angle ≥90°, and after closing, they should adhere well to the door magnet, with no interference that could damage the coating during rotation. Side doors should be flexible to install and remove. For rotating door panels, when installed and opened to about 30°, measure the vertical distance from the side farthest from the pivot to the front plane of the frame, and the difference between the maximum and minimum values should be ≤10mm.

Chassis Cabinet Processing

  4. Chassis and Insert Frame

  4.1 The flatness of the bottom surface and other side surfaces of the chassis should be 1mm.

  4.2 The verticality of the front and rear or left and right vertical surfaces of the chassis relative to the bottom surface should be 1mm.

  4.3 The parallelism of the top and bottom surfaces of the panel should be 0.5mm, and the verticality of the side and bottom surfaces should be 0.5mm.

  4.4 After the panel is installed in the chassis, it should be vertical and upright, with the verticality of its side to the bottom surface of the chassis being 0.5mm, and the parallelism of the bottom surface to the bottom surface of the chassis being 0.5mm.

  4.5 When installing the circuit board or chassis insert frame, it is necessary to use tooling to simulate the circuit board or chassis for assembly. The tooling should be smooth when inserting and removing the insert box, and after inserting the insert box, it should be stable and secure, with no floating or looseness. The hard-connected connectors should align accurately, and there should be no abnormal obstruction during insertion and removal.